Launch 2022-01-15

img_1050m.jpg

Support equipment and spares

img_1100m.jpg

Made it to FAR!

dsc_0633m.jpg

Installing the fins

dsc_0646m.jpg

Aft end of rocket

dsc_9675m.jpg

Checkout complete

Sunrise_m.jpg

Beautiful sunrise

main_parachute_packing.jpg

Main parachute packing

img_1105m.jpg

Drogue parachute packing

taking_to_pad.jpg

Moving to the rail

img_7518m.jpg

On rail prior to launch

img_1122m.jpg

Raising the rail

dsc_0728m.jpg

Engine support block

dsc_9689m.jpg

Pre-launch brief

dsc_9702m.jpg

Fuel fill

dsc_9720m.jpg

Helium fill

dsc_0813m.jpg

LOX fill

img_1131m.jpg

LOX plumbing

img_1128m.jpg

Mission control

dsc_0817m.jpg

Last-minute umbilical adjustment

dsc_9735m.jpg

Liftoff!

img_6293m.jpg

In flight

dsc_9738m.jpg

Main parachute deployment

img_1140m.jpg

Main parachute recovery

img_1146m.jpg

Drogue parachute recovery

img_1151m.jpg

Rocket transport service

rocket_1_test_20220115_maschek_video.mp4

Launch video

rocket_1_test_20220115_onboard_camera.mp4

Onboard camera

rocket1_test_20220115_ridgeway_video.mp4

Drone video

rocket_1_test_20220115_altitude_imu.png

Altitude vs. Time

rocket_1_test_20220115_pressures.png

Pressures (full)

rocket_1_test_20220115_pressures_zoom.png

Pressures (zoom)

rocket_1_test_20220115_tm_rssi.png

Telemetry signal strength

rocket_1_test_20220115_telemini.png

TeleMini data


Thanks to Rick Maschek, Phil Bahorich, Carl Tedesco, Paul Breed, Eric Beckner, Derek Honkawa, John Newman, Amber Lyttle, Mark Holthaus, Lavie Ohana, Daniel Fennell, Austin Sennott, Charles Sharp, Brian Bowling, and Thomas Ridgeway for providing support, photos, and videos. And super-special thanks to my wife Melissa, without whose support none of this would have ever happened.


Parachute Deployment Tests 2020-07-19

img_8373m.jpg

Rocket forebody mounted on pickup

deployment_test_20200719_run7.mp4

Run 7 Clip

dsc_8557m.jpg

Drogue deployment

dsc_8526m.jpg

Main deployment



Nosecone Deployment Tests 2020-06-13

nosecone_deployment_test_20200613.mp4

Nosecone deployment test



Pyroless Recovery Device Tests 2019-06-22

dsc_8024m.jpg

Compressed air test

pyroless_test_20190622-run3.mp4

Run 3 Clip



Hot-Fire Tests 2018-03-10

dsc_5935m.jpg

Pre-test

dsc_5934m.jpg

Test crew

dsc_5967m.jpg

Run 1

dsc_5985m.jpg

Post-test

gs_sw.png

Ground S/W

20180310-run1-cam1-rocket1.mp4

Run 1 Cam 1 Clip

20180310-run1-cam2-rocket1.mp4

Run 1 Cam 2 Clip

20180310-run1-data-full.png

Run 1 Data (full)

20180310-run1-data-zoom.png

Run 1 Data (zoom)


The LOX tank ran out 2 seconds early due to an insufficient LOX load. After the run, there is unburned kerosene dripping out of the engine and a piece of tape on a tube that caught fire. See 2018-03-11 discussion on main page.


Cold Tests 2016-09-11

cold_test_20160911-run1a.png

Run 1 tank pressures (modified fill technique)



Cold Tests 2016-06-19

cold_test_20160619-run3.png

Run 3 tank pressures



Cold Tests 2016-06-18

dsc_2103m.jpg

Overall setup

dsc_2107m.jpg

Top section

dsc_2149m.jpg

Bottom section



Cold Tests 2015-01-03

dsc_0416m.jpg

Pile of cleaned parts

dsc_0433m.jpg

Main valve assembly

dsc_0431m.jpg

Fill valve

dsc_0429m.jpg

Vent valve assembly

20150103-run3-cam1_main_valve.mp4

Main Valve Actuation Clip